Baiziwan station


Baiziwan Station is a station on Line 7 of the Beijing Subway towards the southern part of the city. It was opened on December 28, 2014 as a part of the stretch between and and is located between and.
It is located in Chaoyang District along Guangqu Road east of the East 4th Ring Road Middle on the north side of the former Beijing Chemical Engineering 2nd Plant.

Station layout

The station has an underground island platform.

Exits

There are 4 exits, lettered A1, A2, A3, and B. Exit A1 is accessible.