Unconstructed state routes in Arizona
Below is a list and summary of the unconstructed state highways in the U.S. state of Arizona. Some are currently proposed while the others have since been cancelled prior to being constructed.
State Route 30
State Route 30, also known as the I-10 Reliever, is a planned state highway in the southwest parts of Phoenix, Arizona and nearby suburbs. It will connect the southern terminus of Loop 303 with the South Mountain leg of Loop 202. It is planned as a controlled-access freeway to relieve heavy traffic congestion experienced along Interstate 10 in the area.State Route 50
State Route 50, also known as the Paradise Parkway, was a proposed urban freeway through Glendale and Phoenix. Originally proposed in 1968 as SR 317, the freeway would have run east to west, connecting the future State Route 51 and Loop 101, while running roughly parallel to, and north of, I-10 in the vicinity of Camelback Road. The proposed freeway was reassigned as SR 50 in 1987. As the proposed freeway would have crossed through largely developed land and densely populated neighborhoods, it proved to be both extremely expensive and highly unpopular. The route was eventually struck from state planning maps and all land acquired for right-of-way was subsequently sold, the funds being used to pay for other transportation projects.U.S. Route 87
U.S. Route 87 was a proposed extension of US 87 into eastern Arizona. The proposal also included two split routes which would have been designated U.S. Route 87W and U.S. Route 87E . The proposed US 87 was created by the Tombstone, Arizona based Border-Sunshine Way Association after a meeting in Tucson and was presented to the Arizona State Highway Department on November 3, 1931. Outside Arizona the proposed extension of US 87 would have been extended from its southern terminus in Rawlins, Wyoming through Colorado and New Mexico to Arizona. This would have established concurrencies with US 30, US 40S, US 50, US 550, US 450 and US 66 as well as replacing US 666 between Cortez, Colorado and Gallup, New Mexico.US 87 would have entered Arizona from New Mexico on present day State Route 61 near Zuni, New Mexico, running southwest to St. Johns. It would have run concurrent with the original US 70 between St. Johns and Springerville, Arizona. From Springerville, it would have been concurrent with US 60 heading east to SR 71, then would have replaced SR 71 between US 60 and US 180. US 87 would have been concurrent with US 180 west to Safford, where it would have then replaced SR 81 through Willcox to a junction near Elfrida. The proposed US 87W would have started from US 87 and US 87E near Elfrida, then would have taken Gleeson Road west through Gleeson to Tombstone. US 87W would have had a wrong-way concurrency with US 80 from Tombstone to SR 82. US 87W would have then replaced the entirety of SR 82 between Tombstone Junction and Nogales, establishing a western terminus at US 89. US 87E would have replaced the remainder of SR 81 between Elfrida and Douglas.
The Arizona State Highway Department approved the proposal in 1934 and tried to get US 87 extended into Arizona. The proposed extension of US 87 was ultimately unsuccessful and US 87 was not extended into Arizona by 1935. In an ironic twist, US 666 was extended into Arizona in 1942 along the previously proposed US 87 and US 87E to Douglas. Just 11 years earlier, the US 87 proposal had attempted to replace all of US 666 between Colorado and New Mexico. The Arizona State Highway Department tried a final time in 1943 to extend US 87 into Arizona and requested US 87 replace all of the newly extended US 666 south to Douglas. The attempt was once again unsuccessful, as by 1946, US 666 was still designated between New Mexico and Douglas.