Ambala–Chandigarh Expressway
Ambala Chandigarh Expressway is four-lane 35 km long, high-traffic density corridor of Ambala-Chandigarh section on BOT basis, was completed in 30 months at a cost of The expressway has been operational since December 2009 and was constructed by the GMR Group with assistance from the World Bank.
38 km south of Ambala at existing National [Highway 152 (India)|NH152], it connects with the controlled access tolled Ambala–Narnaul Expressway (Trans-Haryana Expressway).