Abidjan Metro
The Abidjan Metro is a rapid transit network under construction serving the Ivorian economic capital of Abidjan. Construction of the network started in November 2017, with the beginning of passenger service originally expected in 2022–2023, but has since been delayed due to the COVID-19 pandemic to at least 2028. Initially planned to comprise a single line with 13 stations undertaken by Bouygues-Dongsan, a French-Korean consortium, the project has since then been expanded to a single north–south line with 20 stations, financed 100% by France and built solely by three French groups after the withdrawal of the South Korean partners from the consortium in October 2017.
Built mostly as an overground and elevated railway in order to avoid more costly tunnels, its automated trains with a driver present in the cabin will be able to run at a top speed of 80 km/h and a maximum frequency of about every 2 minutes. Line 1 of the Abidjan metro is expected to transport 500,000 passengers per day. Construction of line 1 will cost 920 billion CFA francs, entirely financed by France via the French Treasury and the French Development Agency.
In 2018 the Ivorian government was planning for a second line of the Abidjan Metro, an east–west line which would run from Yopougon to Bingerville.
The Stations
Line 1
- Anyama Centre
- Anyama Sud
- Abobo Nord
- Abobo Intermédiaire
- Abobo Centre
- Abobo Banco
- Abobo Université
- Gare Internationale
- Adjamé Agban
- Adjamé Délégation
- Plateau Centre
- Plateau Lagune
- Treichville
- Treichville Hôpital
- Marcory Canal
- Marcory Centre
- VGE
- Akwaba
- Port-Bouët
- Aérocité