Pan-Borneo Highway
The Pan-Borneo Highway including the sections now known as the Pan Borneo Expressway, is a controlled-access highway on Borneo Island, connecting two Malaysian states, Sabah and Sarawak, with Brunei. The length of the entire highway is for the Malaysian section, for the Bruneian section.
The highway is numbered AH150 in the Asian Highway Network and as Federal Route 1 (Sarawak)|Federal Route 1] in Sarawak. In Sabah, the route numbers given are 1 (Sabah)|1], Malaysia [Federal Route 13 (Sabah)|13] and 22. The upgrading of the highway to dual carriageway is a joint project between both governments, which was started in 2015.
Route background
The Pan-Borneo Highway, Asian Highway Route AH150 is supposed to be a circular highway that runs along the coastlines of Sarawak, Brunei, and Sabah. The Malaysian and Indonesian sections are linked together by a highway known as the Trans-Malindo Highway , which is gazetted as Federal Route 21 in Malaysia. However, a missing link does exist from Serudong, Sabah to Simanggaris, North Kalimantan, which is supposed to connect Sabah with North Kalimantan.The Malaysian section of the Pan-Borneo Highway is signposted as Federal Route 1 in Sarawak and Federal Routes 1, 22 and 13 (Sabah)|13] in Sabah. The 1,077-km highway in Sarawak is divided to 92 sections altogether, and the sections are sometimes being signposted along with the route number with the syntax of xx-yy, where xx is the route number and yy is the section code. In Brunei, the highway is signposted simply as the AH150.
History
The Pan-Borneo Highway was built due to the lack of the intercity highway network in the island of Borneo. In East Malaysia, the intercity highway plan only existed after the Second World War ended in 1945, after the states of North Borneo (Sabah) and Sarawak were ceded to Britain to become British Crown Colonies. By 1949, the Governor of North Borneo reported that there were of roads paved with asphalt, of other metalled roads, of dirt roads and of bridle paths.The construction of the intercity highway network in Sabah and Sarawak intensified at a faster pace after both states participated in the Federation of Malaysia in 1963. In Sabah, the first federally-funded intercity highway project ever constructed was the Federal Route 22 from Kota Kinabalu to Sandakan, as a joint project between the Malaysian federal government with the government of Australia. Also dubbed as the "Malaysia-Australia Road Project", the construction of the FT22 highway began in 1968 and was completed in 1982 with Telupid town became the main centre of the project headquarters.
In the meantime, the Kota Kinabalu–Papar section of the Federal Route 1 was completed in 1964, followed by the Kota Kinabalu–Kudat section which was completed in the 1970s. The entire Sabah Federal Route 1 was completed in 1981 after the construction of the final section from Papar to Sindumin was completed that year. Two years later in 1983, the construction of the Tawau–Semporna Highway was completed. The construction of the remaining section of the FT13 highway was completed in the early 1990s after the construction of Sungai Kinabatangan and Sungai Segama bridges were completed.
Meanwhile, in Sarawak, the construction of the first intercity trunk highway in Sarawak was commenced in 1965, dubbed as the "First Trunk Road". Most of the highway network in Sarawak was constructed within the decades of the 1960s to 1980s. The Lawas–Merapok–Sindumin section was completed in 1981 while the final missing link from Sibu to Bintulu was completed in 1985. However, the highway had not been fully paved with asphalt yet at that time; it was only by the end of Sixth Malaysia Plan in 1995 that the FT1 highway in Sarawak was fully paved.
Before 1996, all routes in the Pan-Borneo Highway network in Malaysia were state highways. After the Federal Roads Act 1959 was made effective in Sabah and Sarawak in 1984, those highways were re-gazetted as federal highways in 1996 with the route number of FT1, FT13 and FT22. Those highways were later gazetted as a part of Asian Highway Network Route AH150.
Although some sections had been upgraded to divided highways, the Pan-Borneo Highway was notorious for its poor condition in many sections., of the Indonesian Trans-Kalimantan Highway was built below the Asian Highway Network Class III standards. Meanwhile, the overall condition in many sections of the Malaysian section of the Highway was poor with many potholes, because most sections of the highway were built with standards as low as JKR R3. A study to upgrade the entire highway to a super two highway under JKR R5 standard was done, which was expected to cost RM16 billion. Ultimately, the Malaysian federal government had opted to upgrade the Pan-Borneo Highway to a divided highway. The upgrade works of the Pan-Borneo Highway to a divided highway is expected to be completed by 2023 for the Sarawakian section and by 2025 for the Sabahan section, with the overall cost of RM27 billion.
Intersections along the Pan Borneo Highway
- Malaysia Federal Route 1 (Sarawak)#List of interchanges, intersections and towns
- Brunei Pan-Borneo Highway#List of interchanges, intersections and towns
- Malaysia Federal Route 1 (Sabah)#List of interchanges
- Kimanis-Keningau Highway#List of interchanges
- Malaysia Federal Route 22#List of interchanges
- Malaysia Federal Route 13 (Sabah)#List of interchanges
Pan Borneo Highway Sabah
Under the rule of then BN government, led by Musa Aman, UEM, MMC and Warisan Tarang Construction Sdn Bhd is teaming up, forms UEM-MMC-Warisan Tarang JV Sdn Bhd via a joint venture and received their role as project delivery partner via Borneo Highway PDP Sdn Bhd in 2016. Warisan Tarang owns BHP. It starts at Sindumin and ends at Serudong. In 2019, UEM announces that UEM-MMC-Warisan Tarang JV Sdn Bhd agrees the WARISAN-Pakatan Harapan government's decision to terminate their role as PDP. Since then, the joint venture company would gave up their operation and gives the project to other contractors to continue, mostly to Public Works Department or Jabatan Kerja Raya. This has caused the Sabah Pan Borneo Highway project to be disrupted in the long run until September 2020.In October 2020, new Sabahan government was established under Gabungan Rakyat Sabah, led by Hajiji Noor, defeating Shafie Apdal's WARISAN in state election. The leaders of GRS announced that the Sabah Pan Borneo Highway will be restarted again and will not terminated the process until the Pan Borneo projects successfully done.
The Pan Borneo Sabah Highway consist of 3 phases namely Phase 1 involved Sindumin-Kota Kinabalu-Kudat, Ranau-Mile 32 Sandakan-Tawau stretch of up to 706 km, while Phase 2 involved Tamparuli-Ranau and Phase 3 involving Tawau-Kalabakan-Keningau-Kimanis.
Phase 1A planned for completion in 2026 and phase 1B will be completed by 2029.
The contractors and WPCs involved are:
Phase 1A (Sipitang – Kudat -Tawau)
- Juta Hajat Sdn Bhd – Syarikat Kumpulan Kemajuan KK Sdn Bhd JV – WP01 Sindumin to Kampung Melalia
- Expowarisan Sdn Bhd – Katata Construction Sdn Bhd JV – WP02 Kampung Melalia to Beaufort
- Tanah Permai Sdn Bhd – WP03 Beaufort to Bongawan
- Pembinaan Kekal Mewah Sdn Bhd – WP04 Bongawan to Papar
- Akif Jaya Sdn Bhd – WP05 Papar to Donggongon
- Pembinaan Azam Jaya Sdn Bhd – WP06 Putatan to Inanam
- Perwira Progresif Construction Sdn Bhd – WP07 Inanam to Sepanggar
- Sinkong Fleet JV Sdn Bhd – WP08 Sepanggar to Berungis Roundabout
- Under tender – WP09 Serusop to Pituru
- Kontraktor Fokus Niaga Sdn Bhd – Jutawan Borneo Sdn Bhd – Wilayah Kaya Sdn Bhd JV – WP10 Pituru to Rampayan Laut Jewel Borneo Sdn Bhd – WP15 Tawau to Kampung Check Point
- BHO Sdn Bhd / Mancon Berhad – WP21 Lahad Datu Bypass
- Sri Jutaya Sdn Bhd – WP27 Mile 32 to Kampung Lot M, Sandakan
- Pembinaan Kekal Mewah Sdn Bhd – WP28 Mile 32 to Moynod Junction
- Korporat Fokus Niaga JV Sdn Bhd – WP29 Moynod Junction to Sapi Nangoh
- Perwira Progresif Construction Sdn Bhd – WP30 Sapi Nangoh to Sungai Baoto
- Under tender – WP36 Berungis Roundabout to Kota Belud
- Under tender – WP37 Kota Belud to Bengkongan
- Under tender – WP38 Bengkongan to Matunggong
- Under tender – WP39 Matunggong to Kudat
- Under tender – WP40 Bengkongan to Pitas
- Under tender – WP41 Pitas to Kanibongan-Paitan Junction
- Under tender – WP42 Sandakan-Beluran Junction to Beluran
- Under tender – WP43 Beaufort to Kuala Penyu
- Under tender – WP44 Kuala Penyu to Menumbok
Phase 1B (Kudat – Semporna)
- YTO Group Sdn Bhd – WP11 Rampayan Laut to Sarang
- Pembinaan Azam Jaya Sdn Bhd – WP12 Sarang to Temuno
- Pembinaan Azam Jaya Sdn Bhd – Katata Construction Sdn Bhd JV – WP13 Temuno to Bingolon
- Tekad Warisan Sdn Bhd – WP14 Bingolon to Simpang Mengayau
- Under tender – WP15 Simpang Mengayau
- Advance Grow Sdn Bhd – WP16 Kampung Check Point to Sungai Kalumpang
- Kenari Express Sdn Bhd – WP17 Sungai Kalumpang to Madai
- Pembinaan Mesra Rezeki Sdn Bhd – WP18 Madai to IGN Estate
- Korporat Muda Sdn Bhd – WP19 IGN Estate to Agri Harvest
- Exodaya Sdn Bhd – WP20 Agri Harvest to Sepagaya
- Pembinaan Urusmesra Sdn Bhd – WP22 Lahad Datu Bypass to Kampung Sandau
- Pembinaan Kerjadi Sdn Bhd – WP23 Kampung Sandau to Sungai Takala
- Wilayah Kaya Sdn Bhd – WP24 Sungai Takala to Kampung Perpaduan Datuk Moh
- Under tender – WP25 Kampung Perpaduan Datuk Moh to Sukau
- Pembinaan Azam Jaya Sdn Bhd – PWMW Constructions Sdn Bhd JV – WP26 Sukau to Kampung Lot M
- Sri Jutaya Sdn Bhd – WP31 Sungai Baoto to Telupid
- Under tender – WP32 Telupid to Kampung Lumou Baru
- MTD Construction Sdn Bhd – WP33 Kampung Lumou Baru to Kampung Toupos
- Menta Construction Sdn Bhd – WP34 Kampung Toupos to Kampung Nabutan
- Binaan Desjaya Sdn Bhd – Gagasan Maya Sdn Bhd JV – WP35 Kampung Nabutan to Ranau
- Under tender – WP45 Sapi Nangoh to Boitition
- Under tender – WP46 Boitition to Paitan
- Under tender – WP47 Paitan to Kanibongan-Paitan Junction
- Under tender – WP48 Lahad Datu to Bakapit
- Under tender – WP49 Bakapit to Sungai Tungku
- Under tender – WP50 Sungai Tungku to Felda Sahabat
- Under tender – WP51 Kampung Check Point to Semporna
Phase 2 (Ranau – Tamparuli)
- 'TBA'''''
Phase 3 (Tawau – Kimanis)
- TBA
Pan Borneo Highway Sarawak
In 2015, then Prime Minister Najib Razak and then Chief Minister, Adenan Satem launched the Pan Borneo Highway project in Telok Melano. The main purpose was to upgrade the two-way lane to four lane two-way lane. 50 years ago, long-distance travelling was the only way through the two way and it was unhappy news for those who traveled to other parts of the state for working abroad and holiday seasons. It was Adenan's manifesto to upgrade the state's infrastructure. 10 contractors were involved in this project, beginning with Samling Resources Sdn Bhd for works package which connects Telok Melano and Sematan in December 2015 as the first contractor and ended with Konsortium KPE Sdn Bhd for Sg. Tangap to Pujut Link Road in July 2016 as among the last contractors to do so. The length of this project was almost 1000 km and the cost was near RM1 billion.Of all the projects, WPC01 Telok Melano to Sematan was the shortest length while WPC02 Sematan to Sg. Moyan was the longest length, both went by Samling and there are 24 interchanges built at the each of projects, consists WPC02, WPC03, WPC04, WPC05, WPC06, WPC07, WPC08, WPC10 & WPC11. Contractors involved are:
- Samling Group of Companies
- Zecon Berhad
- Kimlun Corporation Bhd
- Naim Holdings Berhad
- Gamuda Berhad
- Endaya Construction Sdn Bhd
- TRC Synergy Berhad
- Pembinaan Kuantiti Sdn Bhd
- Cahya Mata Sarawak Sdn Bhd )
- Bina Puri, via Bina Puri Sdn Bhd
- Hock Seng Lee Berhad
- Dhaya Maju Infrastructure (Asia) Sdn Bhd
- Musyati Sdn Bhd
- Mudajaya Group Berhad
- KKB Engineering Berhad
- WCT Holdings Berhad
- Shin Yang Group of Companies
- Konsortium KPE Sdn Bhd
Former contractor
- Ekovest Berhad – JV with Samling Group terminated in 2019 following project dispute
The contractors were divided into different WPCs:
Phase 1 (Telok Melano – Miri)
- Samling Resources Sdn Bhd – WPC01 Telok Melano to Sematan & WPC02 Sematan to Sg. Moyan + KSR Interchanges
- Zecon Kimlun JV Consortium Sdn Bhd – WPC03 Serian Roundabout to Pantu Junction
- Naim Gamuda JV Sdn Bhd – WPC04 Pantu Junction to Batang Skrang
- Endaya – TRC – PK JV Sdn Bhd – WPC05 Batang Skrang to Sg. Awik
- PPESW BPSB JV Sdn Bhd – WPC06 Sg. Awik to Bintangor Junction
- HSL DMIA JV Sdn Bhd – WPC07 Bintangor Junction to Sg. Kua Bridge
- Musyati Mudajaya JV Sdn Bhd – WPC08 Sg. Kua Bridge to Sg. Arip Bridge
- KKBWCT Joint Venture Sdn Bhd – WPC09 Sg. Arip Bridge to Bintulu Airport Junction
- Pekerjaan Piasau Konkerit Sdn Bhd – WPC10 Bintulu Airport Junction to Sg. Tangap + Kick-Off Project Nyabau to Bakun Junction
- Konsortium KPE Sdn Bhd – WPC11 Sg. Tangap to Pujut Link Road
Phase 2 (Miri – Ba'kelalan – Limbang)
Proposal project
- TBA – WP0 Miri – Mulu Access Road
Package 01 (Mulu – Long Seridan)
- TBA – WP01A Mulu to Jalen Camp
- TBA – WP01B Jalen Camp to Long Seridan
Package 02 (Long Seridan – Nanga Medamit)
- TBA – WP02A Long Seridan to Long Napir
- TBA – WP02B Long Napir to Nanga Medamit
Package 03
- TBA – WP03 Long Luping to Long Komap
Package 04 (Rh. Aling – Long Luping)
- TBA – WP04A Rh. Aling to Pagon Hill
- TBA – WP04B Pagon Hill to Long Luping