Early 20th century

The Port of Prince Rupert was built upon the completion of the Grand Trunk Pacific Railway in 1914 and its development had been promoted by Grand Trunk Railway president Charles Melville Hays as an alternative to the Port of Vancouver, which was serviced by the Canadian Pacific and Canadian Northern railways. In 1919, the Grand Trunk Pacific fell into bankruptcy and was nationalized by the federal government and merged into the Canadian National Railways.
The port was expanded during World War II to support Canadian and United States military action in the Pacific Theatre, notably in the Alaska Territory.

Late 20th century

Prince Rupert was declared a public harbour in 1912, and later became a national harbour on,
followed by several years of construction of various facilities such as the Fairview and Ridley Terminals.
Status evolved again in 1983, becoming a Port Corporation under the Canada Ports Corporation Act.
A 1989 expansion of the Fairview Terminal added a third berth and 6.5 ha of storage area.
In 1989, 1,705 total vessels, including 468 deep sea vessels, with 11,332,000 tonnes of cargo moved through the port.
Between the Aquatrain barge carried rail cargo between Prince Rupert and Whittier, Alaska.
Service ended in April 2021.

Conversion to an intermodal terminal

In April 2005, it was announced that the Fairview Terminal would be converted into an intermodal container shipping terminal, given Prince Rupert's advantages of having a location along the Pacific Great Circle Route between Asia and the west coast of North America; which makes it the first inbound and last outbound port of call, as well as having the deepest natural harbour depths on the continent.
With both a shorter route to Prince Rupert, and with less municipal congestion than other West Coast ports, additional rail infrastructure investments toward Canada's heartland cut time from East Asian markets to North American destinations. Sea travel time to the West Coast, time in processing the containers in port, and the time in getting products to the Midwestern United States became more efficient. The overall time from ports like Busan, Hong Kong, Kaohsiung, Shanghai, and Singapore in Asia and to eventual Midwest destinations like, Chicago, Detroit, Milwaukee, Minneapolis, and St. Louis, see time and cost reductions.
On September 12, 2007, phase 1 the Fairview Terminal opened for business and received its first container ship in October. Phase 1 has an annual container-handling capacity of only 500,000 TEUs. However Phase 2, planned to be completed late in 2010, will increase the Port of Prince Rupert's capacity to 2 million TEUs, and to 4 million TEUs by 2015, and there is extensive capacity for further expansion. This will provide much-needed relief to the congested west-coast ports of North America. The containerization of the Fairview Terminal is an important part of the Asia–Pacific Gateway and Corridor Initiative of the Government of Canada and the Pacific Gateway strategy of the Province of British Columbia.
The second phase expansion has been protested by some First Nations groups, saying that the PRPA failed to consult them. Another group in Delta is lobbying for the expansion of the Prince Rupert port in order that the port at Delta will not be expanded.
On January 23, 2013, federal Environment Minister Peter Kent approved the environmental assessment of the Phase 2 expansion of the terminal. However, there was no set time frame for the construction of Phase 2, as the decision is up to Maher Terminals to proceed. It was noted that the need for expansion does not yet exist as through operation efficiencies achieved by the design of the terminal and the workforce, the actual capacity of the terminal exceeds current demand.
In January 2015 there was a trade dispute when the State of Alaska had solicited for bids for a ferry terminal update. The project was seeking U.S. Federal funds which required that the project comply with the Buy America Act. The Canadian Government blocked the project and the state of Alaska canceled bids because a temporary solution could not be reached.
The Port of Prince Rupert is advancing its logistics infrastructure through the development of LinX, a transload and logistics facility set to launch in Q1 2027. Operated by IntermodeX, an SSA Marine Enterprise, the initial 30-acre phase will include a 100-door facility designed to streamline cargo movement between North America and the Asia-Pacific region, leveraging the port’s strategic proximity to Asia and CN’s rail network.
The project aligns with the port’s broader role as North America’s closest gateway to Asia, offering reduced transit times and streamlined intermodal services through its integration with CN’s transcontinental rail network.

Governance

The Prince Rupert Port Authority was created on May 1, 1999 and succeeds the Prince Rupert Port Corporation. Prince Rupert was among 8 national ports in Canada which implemented this administrative change on this date, as required by the Canada Marine Act which passed on June 11, 1998. PRPC was the successor to the National Harbours Board, which previously operated all federally owned ports in Canada.
PRPA reports to the Minister of Transport and has a Board of Directors typically consisting of local business and community figures. In the past, the appointment process to the boards of Canada's port authorities has been criticized as they have frequently been used for political patronage.

Facilities

PRPA port facilities include:
  • Atlin Terminal
  • Northlands Cruise Terminal
  • Lightening Dock
  • Ocean Dock
  • Pinnacle Pellet Terminal
  • Fairview Terminal
  • Prince Rupert Grain
  • Trigon Pacific Terminals
  • Westview Wood Pellet Terminal
All PRPA facilities are serviced by CN Rail.
TerminalOperatorDepth
BerthsQuay length
Quay cranesArea
Capacity
References
Fairview PRPA1614003234,718500
Fairview PRPA1658008–12667,7312000

With the completion of Phase 2, the port has a capacity of 2,000 kTEUs. For comparison, the Port of Vancouver handles 2,500 kTEUs of cargo.

Pacific port volumes

Cargo handled expressed in the number of 20-foot-equivalent units and million metric tonnes. Statistics for American ports are excluded, because of inconsistencies among various web pages. The major differences may be due to the inclusion of empty containers shipped.

Funding for container terminal

The Canadian $170 million terminal project, with a design capacity of 500,000 TEUs has been funded by five partners:
  • Maher Terminals, $60 million, including the three super-post panamax cranes
  • Government of Canada: Western Economic Diversification Canada, $30 million
  • Province of British Columbia, $30 million
  • CN Rail, $25 million towards the terminal's rail-related infrastructure
  • Prince Rupert Port Authority, $25 million