The Metropolitan Railway was a passenger and goods railway that served London from 1863 to 1933, its main line heading north-west from the capital's financial heart in the City to what were to become the Middlesex suburbs. Its first line connected the main-line railway termini at,, and King's Cross to the City. The first section was built beneath the New Road using cut-and-cover between Paddington and King's Cross and in tunnel and cuttings beside Farringdon Road from King's Cross to near Smithfield, near the City. It opened to the public on 10 January 1863 with gas-lit wooden carriages hauled by steam locomotives, the world's first passenger-carrying designated underground railway.
The line was soon extended from both ends, and northwards via a branch from Baker Street. Southern branches, directly served, reached Hammersmith in 1864, Richmond in 1877 and the original completed the Inner Circle in 1884. The most important route was northwest into the Middlesex countryside, stimulating the development of new suburbs. Harrow was reached in 1880, and from 1897, having achieved the early patronage of the Duke of Buckingham and the owners of Waddesdon Manor, services extended for many years to in Buckinghamshire.
Electric traction was introduced in 1905, and by 1907 electric multiple units operated most of the services, though electrification of outlying sections did not occur until decades later. Unlike other railway companies in the London area, the Met developed land for housing, and after World War I promoted housing estates near the railway using the "Metro-land" brand. On 1 July 1933, the Met was amalgamated with the Underground Electric Railways Company of London and the capital's tramway and bus operators to form the London Passenger Transport Board.
Former Met tracks and stations are used by the London Underground's Metropolitan, Circle, District, Hammersmith & City, Piccadilly, Jubilee and Victoria lines, and by Chiltern Railways and Great Northern.
History
Paddington to the City, 1853–63
Establishment
In the first half of the 19th century the population and physical extent of London grew greatly. The increasing resident population and the development of a commuting population arriving by train each day led to a high level of traffic congestion with huge numbers of carts, cabs, and omnibuses filling the roads and up to 200,000 people entering the City of London, the commercial heart, each day on foot. By 1850 there were seven railway termini around the urban centre of London: London Bridge and Waterloo to the south, Shoreditch and Fenchurch Street to the east, Euston and King's Cross to the north, and Paddington to the west. Only Fenchurch Street station was within the City.The congested streets and the distance to the City from the stations to the north and west prompted many attempts to get parliamentary approval to build new railway lines into the City. None were successful, and the 1846 Royal Commission on Metropolitan Railway Termini banned construction of new lines or stations in the built-up central area. The concept of an underground railway linking the City with the mainline termini was first proposed in the 1830s. Charles Pearson, Solicitor to the City, was a leading promoter of several schemes and in 1846 proposed a central railway station to be used by multiple railway companies. The scheme was rejected by the 1846 commission, but Pearson returned to the idea in 1852 when he helped set up the City Terminus Company to build a railway from Farringdon to King's Cross. The plan was supported by the City, but the railway companies were not interested and the company struggled to proceed.
The Bayswater, Paddington, and Holborn Bridge Railway Company was established to connect the Great Western Railway's Paddington station to Pearson's route at King's Cross. A bill was published in November 1852 and in January 1853 the directors held their first meeting and appointed John Fowler as its engineer. After successful lobbying, the company secured approval in the ' under the name of the "North Metropolitan Railway" in mid-1853. The bill submitted by the City Terminus Company was rejected by Parliament, which meant that the North Metropolitan Railway would not be able to reach the City: to overcome this obstacle, the company took over the City Terminus Company and submitted a new bill in November 1853. This dropped the City terminus and extended the route south from Farringdon to the General Post Office in St. Martin's Le Grand. The route at the western end was also altered so that it connected more directly to the GWR station. Permission was sought to connect to the London and North Western Railway at Euston and to the Great Northern Railway at King's Cross, the latter by hoists and lifts. The company's name was also to be changed again, to Metropolitan Railway. royal assent was granted to the ' on 7 August 1854.
Construction of the railway was estimated to cost £1 million. Initially, with the Crimean War under way, the Met found it hard to raise the capital. While it attempted to raise the funds it presented new bills to Parliament seeking an extension of time to carry out the works. In July 1855, the ', which made a direct connection to the GNR at King's Cross, received royal assent. The plan was modified by the ' and again later by the Great Northern and Metropolitan Junction Railway Act 1860.
The GWR agreed to contribute £175,000 and a similar sum was promised by the GNR, but sufficient funds to make a start on construction had not been raised by the end of 1857. Costs were reduced by cutting back part of the route at the western end so that it did not connect directly to the GWR station, and by dropping the line south of Farringdon. In 1858, Pearson arranged a deal between the Met and the City of London Corporation whereby the Met bought land it needed around the new Farringdon Road from the City for £179,000 and the City purchased £200,000 worth of shares. The route changes were approved by Parliament in the of August 1859, meaning that the Met finally had the funding to match its obligations and construction could begin.
Construction
Despite concerns about undermining and vibrations causing subsidence of nearby buildings and compensating the thousands of people whose homes were destroyed during the digging of the tunnel, construction began in March 1860. The line was mostly built using the "cut-and-cover" method from Paddington to King's Cross; east of there it continued in a tunnel under Mount Pleasant, Clerkenwell then followed the culverted River Fleet beside Farringdon Road in an open cutting to near the new meat market at Smithfield.The trench was wide, with brick retaining walls supporting an elliptical brick arch or iron girders spanning. The tunnels were wider at stations to accommodate the platforms. Most of the excavation work was carried out manually by navvies; a primitive earth-moving conveyor was used to remove excavated soil from the trench.
Within the tunnel, two lines were laid with a gap between. To accommodate both the standard gauge trains of the GNR and the broad gauge trains of the GWR, the track was three-rail dual gauge, the rail nearest the platforms being shared by both gauges. Signalling was on the absolute block method, using electric Spagnoletti block instruments and fixed signals.
Construction was not without incident. In May 1860, a GNR train overshot the platform at King's Cross and fell into the workings. Later that year, a boiler explosion on an engine pulling contractor's wagons killed the driver and his assistant. In May 1861, the excavation collapsed at Euston causing considerable damage to the neighbouring buildings. The final accident occurred in June 1862 when the Fleet sewer burst following a heavy rainstorm and flooded the excavations. The Met and the Metropolitan Board of Works managed to stem and divert the water and the construction was delayed by only a few months.
Trial runs were carried out from November 1861 while construction was still under way. The first trip over the whole line was in May 1862 with William Gladstone among the guests. By the end of 1862, work was complete at a cost of £1.3 million.
In that year, Myles Fenton, then serving as assistant manager of the Lancashire and Yorkshire Railway, was appointed as the first manager of the new company.
Opening
inspections took place in late December 1862 and early January 1863 to approve the railway for opening. After minor signalling changes were made, approval was granted and a few days of operating trials were carried out before the grand opening on 9 January 1863, which included a ceremonial run from Paddington and a large banquet for 600 shareholders and guests at Farringdon. Charles Pearson did not live to see the completion of the project; he died in September 1862.The railway opened to the public on 10 January 1863, with stations at Paddington , Edgware Road, Baker Street, Portland Road, Gower Street, King's Cross, and Farringdon Street. The railway was hailed a success, carrying 38,000 passengers on the opening day, using GNR trains to supplement the service. In the first 12 months 9.5 million passengers were carried and in the second 12 months this increased to 12 million.
The original timetable allowed 18 minutes for the journey. Off-peak service frequency was every 15 minutes, increased to ten minutes during the morning peak and reduced 20 minutes in the early mornings and after 8 pm. From May 1864, workmen's returns were offered on the 5:30 am and 5:40 am services from Paddington at the cost of a single ticket.
The railway was initially worked by GWR broad-gauge Metropolitan Class tank locomotives and rolling stock. Soon after the opening, disagreement arose between the Met and the GWR over the need to increase the frequency, and the GWR withdrew its stock in August 1863. The Met continued operating a reduced service using GNR standard-gauge rolling stock before purchasing its own standard-gauge locomotives from Beyer, Peacock and Company and rolling stock.
The Metropolitan initially ordered 18 tank locomotives, of which a key feature was condensing equipment which prevented most of the steam from escaping while trains were in tunnels; they have been described as "beautiful little engines, painted green and distinguished particularly by their enormous external cylinders." The design proved so successful that eventually 120 were built to provide traction on the Metropolitan, the District Railway and all other 'cut and cover' underground lines. This 4-4-0 tank engine can therefore be considered as the pioneer motive power on London's first underground railway; ultimately, 148 were built between 1864 and 1886 for various railways, and most kept running until electrification in 1905.
In the belief that it would be operated by smokeless locomotives, the line had been built with little ventilation and a long tunnel between Edgware Road and King's Cross. Initially the smoke-filled stations and carriages did not deter passengers and the ventilation was later improved by making an opening in the tunnel between Gower Street and King's Cross and removing glazing in the station roofs. With the problem continuing after the 1880s, conflict arose between the Met, who wished to make more openings in the tunnels, and the local authorities, who argued that these would frighten horses and reduce property values. This led to an 1897 Board of Trade report, which reported that a pharmacist was treating people in distress after having travelled on the railway with his 'Metropolitan Mixture'. The report recommended more openings be authorised but the line was electrified before these were built.