M62 motorway


The M62 is a west–east trans-Pennine motorway in Northern England, connecting Liverpool and Hull via Manchester, Bradford, Leeds and Wakefield; of the route is shared with the M60 orbital motorway around Manchester. The road is part of the unsigned Euroroutes E20 and E22.
The motorway, which was first proposed in the 1930s, and conceived as two separate routes, was opened in stages between 1971 and 1976, with construction beginning at Pole Moor near Huddersfield and finishing at that time in Tarbock on the outskirts of Liverpool. The motorway absorbed the northern end of the Stretford-Eccles bypass, which was built between 1957 and 1960.
Adjusted for inflation to 2007, its construction cost approximately £765 million. The motorway has an average daily traffic flow of 144,000 vehicles in West Yorkshire, and has several sections prone to traffic congestion, in particular, between Leeds and Huddersfield and the M60 section around Eccles. The M62 coach bombing of 1974 and the Great Heck rail crash of 2001 are the largest incidents to have occurred on the motorway.
Stott Hall Farm, situated between the carriageways on the Pennine section, has become one of the best-known sights on the motorway. The M62 has no junctions numbered 1, 2 or 3, or even an officially numbered 4, because it was intended to start in Liverpool proper, not in its outskirts.
Between Liverpool and Manchester, and east of Leeds, the terrain along which the road passes is relatively flat. Between Manchester and Leeds it traverses the Pennines and its foothills, rising to above sea level slightly east of junction 22 in Calderdale, not far from the boundary between Greater Manchester and West Yorkshire.

Planning

The motorway's origins are found in the 1930s, when the need for a route between Lancashire and Yorkshire had been agreed after discussion by their county highway authorities. At the same time, it was envisaged that a route between Liverpool and Hull was needed to connect the ports to industrial Yorkshire.
After the Second World War, the Minister of Transport appointed engineers to inspect road standards between the A580 East Lancashire Road in Swinton and the A1 road near Selby. The 1949 Road Plan for South Lancashire identified the need to upgrade the A580 to dual carriageway with grade separation and provide bypasses at Huyton and Cadishead. In 1952, the route for a trans-Pennine motorway, the Lancashire–Yorkshire Motorway, was laid down, with Ferrybridge at the eastern terminus rather than Selby. By the 1960s, the proposed A580 upgrade to dual carriageway was considered inadequate, and there was an urgent need to link Liverpool to the motorway network.
The route of the Lancashire-Yorkshire motorway was considered inadequate as it failed to cater for several industrial towns in Yorkshire. When James Drake visited the United States in 1962, his experience of the Interstate Highway System led him to conclude that the Merseyside Expressway, planned to run between Liverpool and the M6, would need to be extended to the Stretford-Eccles Bypass and beyond, to create a continuous motorway between Liverpool and Ferrybridge. Initially the plans were unpopular and not supported by the Ministry of Transport, but the scheme was added to the Road Plan in 1963.

Surveying

Formal planning began on Wednesday 12 July 1961, when Ernest Marples authorised the two surveyors of Lancashire and the West Riding – Sir James Drake of Lancashire and Stuart Maynard Lovell of the West Riding, to plan a motorway from Worsley, in Lancashire, to Ledsham in the West Riding. From either end, the plan was that there would be 'improved roads' from the eastern end, at the Selby Fork, eastwards to Hull, and 'improved roads' from the western end, at Worsley, westwards to Liverpool.

Construction

Liverpool to Worsley

It was the intention to build an urban motorway in Liverpool. The M62 was intended to terminate at Liverpool's Inner Motorway, which was not built. The proposed route would have followed the railway into Liverpool as far as Edge Hill, with junctions at Rathbone Road and Durning Road where it would drop to two lanes before terminating at the Islington Radial. Difficulties arose building the Liverpool urban motorway resulting in delays, with the section between Tarbock and Liverpool the last to be completed in 1976. In total, two viaducts, ten bridges and seven underpasses were constructed to secure the structural integrity of the surrounding residential areas. The motorway was constructed only as far as the Queens Drive inner ring road, which is junction 4.
The section west of Manchester was intended to be a separate motorway, the M52 to link Liverpool and Salford, but a continuous motorway between Leeds and Liverpool was deemed more feasible, Construction between Liverpool and Manchester started in 1971, with the construction of a link between the M57 and M6 motorways. Simultaneously, a contract to link the M6 with Manchester was underway, which required land drainage and the removal of unsuitable earth. This section was completed in August 1974, creating a continuous link between Ferrybridge and Tarbock.

Greater Manchester

Two motorways were planned, the M52 from Liverpool to Salford and the M62 to link Pole Moor with the Stretford–Eccles Bypass. The first part of the M62 to be built was the Stretford–Eccles Bypass, which is now the section between Junctions 7 to 13 of the M60. Construction started in 1957, and the motorway opened in 1960. It was originally built as a two-lane motorway only. It was later re-numbered M63. The section of the planned M52 between the interchange with the Stretford-Eccles Bypass and Salford opened as the M602 motorway in 1971.
The Eccles–Pole Moor section of the M62 opened in 1971. Between Eccles and Pole Moor, 67 motorway crossings were required, including seven viaducts and eight junctions. Much of the Worsley Braided Interchange was built on undeveloped mossland where deep peat deposits had been covered with waste. Between Worsley and Milnrow, some underlying coal seams were still actively worked when the motorway was constructed and allowances had to be made to counteract possible future subsidence. The motorway crosses the Irwell Valley and the Pendleton Fault on a single-span bridge above the river.

Milnrow to Outlane

Surveying for the Pennine section began in November 1961 and its route was determined in July 1963. Construction between Windy Hill and Pole Moor was difficult through inhospitable hilly terrain, peat bog, and in undesirable weather conditions. The motorway's highest point, above sea level at Windy Hill near Denshaw is the highest point of any motorway in England.
A notable structure between junctions 21 and 22 on the uphill section towards Windy Hill is the Rakewood Viaduct which carries the road over the Longden End Brook.
The first section of the motorway in Yorkshire was completed between the county boundary at Windy Hill and Outlane in 1970.
To build this section, of material was moved, of which was solid rock and of peat which had to be cut from the rock strata and deposited on adjacent hillsides. The geology of the moors resulted in the engineers splitting the carriageways for in the middle of this section, sparing Stott Hall Farm from demolition. The farm, which was built in the 18th century, remains the only one situated in the middle of a UK motorway.
The motorway crosses Scammonden Dam on an embankment between junctions 22 and 23. Preparatory work in the Deanhead Valley began in August 1964 and the dam in 1966. The motorway's opening on 20 December 1970 was dependent on completion of the dam. Two other notable constructions on the Pennine section are the pedestrian bridge carrying the Pennine Way, which is curved downwards with long cantilevers, and Scammonden Bridge, the longest single-span non-suspension bridge in the world when it was built. It carries a B road above the motorway. The section between Pole Moor and Outlane suffered fewer problems as the summer weather was satisfactory.

Outlane to Lofthouse

The section of the motorway between Gildersome and Lofthouse was built at the same time, resulting in the demolition of a significant proportion of the village of Tingley to build the eponymous interchange.
Lofthouse Interchange was built between 1965 and 1967. Owen Williams and the Babtie Group were the engineers. Located where the M62 crosses above the M1 motorway, it is a complex three-level junction with eight bridges including a roundabout supported by four long curved bridges on piers above both motorways. The roundabout's north and south bridges have spans of and the east and west have spans of. The M62 overbridge has a reinforced concrete multi-cellular deck of four spans. Two other pre-stressed reinforced concrete bridges carry slip roads over Longthorpe Lane, the B6135. Another bridge with no motorway access carries Longthorpe Lane over the M1.
Two skew tunnels were constructed beneath the original junction between 1996 and 1999. The tunnels, constructed using the cut-and-cover method, are for traffic travelling between the M1 south-bound and the M62 west. The tunnel under the M62 is in length.

East of Lofthouse

Two contracts were awarded for the section between Lofthouse and Ferrybridge in 1972, and both were completed in 1974. On the first contract, care was needed at the River Calder crossing due to the alluvial bedrock. On the second contract precautions were taken as the length was built on old coal mine workings.
The section between Ferrybridge and North Cave was the last to be planned and built. The Ouse Bridge, across the River Ouse west of Goole, commenced in January 1973 and is nearly long and rises to above ground level. Completion of the bridge was delayed due to "steel supplies a chronic headache" and a partial collapse of the framework caused by bolts joining a cross-beam to a trestle shearing. Problems with the bridge delayed the opening of the section east of Goole to May 1976.