The British Rail Class 91 is a high-speed electric locomotive, which produces power of ; it was ordered as a component of the East Coast Main Line modernisation and electrification programme of the late 1980s. The Class 91s were given the auxiliary name of InterCity 225 to indicate their envisaged top speed of ; they were also referred to as Electras by British Rail during their development and throughout the electrification of the East Coast Main Line.
The locomotive body shells are of all-steel construction. Unusually, the motors are body mounted and drive bogie-mounted gearboxes via cardan shafts; this reduces the unsprung mass and hence track wear at high speeds. The locomotive also features an underslung transformer, therefore the body is relatively empty compared to contemporary electric locomotives. Much of the engineering specification for the locomotive was derived from the research and operational experience of the APT-P.
The other end of the InterCity 225 train set is formed of a Mark 4 Driving Van Trailer, built with a similar body shell to the Class 91 locomotives but with only one driving cab.
History
Background
The origins of the Class 91 are closely associated with the East Coast Main Line on which it has been primarily operated. During the 1950s, British Rail had considered electrification of the ECML to be of equal importance to the West Coast Main Line, but various political factors led to the envisioned electrification programme being delayed for decades; as an alternative, high-speed diesel traction, the Deltic and then the InterCity 125, was introduced upon the route during the 1960s and 1970s. During the 1970s, a working group of British Rail and Department of Transport officials determined that, out of all options for further electrification, the ECML represented the best value by far. Its in-house forecasts determined that increases in revenue and considerable reductions in energy and maintenance costs would occur by electrifying the line.Accordingly, between 1976 and 1991, the ECML was electrified with overhead lines. The electrification was installed in two phases: The first phase between London and was carried out between 1976 and 1978 as the Great Northern Suburban Electrification Project, using Mk. 3A equipment, covering in total. In 1984, the second phase commenced to electrify the northern section to Edinburgh and Leeds. During the late 1980s, the programme was claimed to be the longest construction site in the world, spanning more than.
In 1989 the InterCity 225 was officially introduced to revenue service. That same year, the ECML had been energised through to York; two years later, electrification had reached Edinburgh, allowing electric services to begin on 8 July 1991, eight weeks later than scheduled. The ECML electrification programme was completed at a cost of £344.4million, a minor overrun against its authorised expenditure of £331.9million. 40 per cent of the total cost was on new traction and rolling stock and 60 per cent for the electrification of the line.
Options and selection
The electrification of the ECML necessitated the procurement of new high speed electric traction. The options and requirements for this trainset were hotly deliberated for a number of years. On 7 June 1978, the electric-powered prototype Advanced Passenger Train was unveiled; it was at one point intended for the APT to be the next major intercity express train. However, due to various factors including technical issues, the APT programme was curtailed during the summer of 1983. Shortly thereafter, two alternative options were explored, an electrified version of the InterCity 125, and the mixed-traffic locomotive; these were both intended to a peak service speed of 125mph.Some officials within British Rail pushed for more demanding requirements for the future Intercity trainset; reportedly, BR's Director of Mechanical and Electrical Engineering was a strong proponent for increasing the top speed to 140 mph. To facilitate this, tilting train technologies developed for the APT were explored. While BR's board had approved the ordering of a single Class 89 as a prototype, the Strategy Committee queried why the type had been favoured over a proposed 80-tonne Bo-Bo locomotive. While the Class 89 was thought to be a low-risk option for multi-purpose traction, it offered little advantage over the existing in terms of speed. At the time, the 1950s era and electric locomotives were nearing the end of their viable service lives and were quite unreliable, but their withdrawal had effectively been ruled out by a national shortage of newer electric traction, in part caused by the APT's cancellation.
A key advantage of the InterCity 225 concept over a Class 89-hauled consist was the lower weight of the former, resulting in less slippage and greater acceleration over the latter. Appraisals also determined that the Class 89 was comparatively inferior in financial terms, in part due to the InterCity 225's prospective compatibility with WCML traction, reducing its development costs. A further cost-saving measure was the decision to base the InterCity 225's technologies on the APT. BR reportedly stated that it had derived 90% of the former's engineering from the latter. Thus, the study group recommended that the InterCity 225 be pursued as the preferred option, while the Class 89 and HST-E initiatives serve as back-ups. Despite this, the HST-E effort was promptly aborted, while Brush Traction decided to de-prioritise work on the Class 89 after learning that it was unlikely to lead to volume production.
By spring 1984, favour was being given towards the adoption of a tilting carriage, tentatively designated as the Mk 4; this was viewed as superior to the existing Mk 3 and enabled a single design to be shared between the ECML and WCML. At one point, it was envisaged that the InterCity 225 would be extremely ubiquitous, even potentially having the capability built into it to operate over the southern third-rail network and within the Channel Tunnel; by mid 1984, such proposals were curtailed. Furthermore, it was decided to reduce the freight haulage capabilities of the InterCity 225, as traction for this sector was instead intended to be served via other platforms. The emergence of the, derived from the existing Class 87, somewhat reduced the pressure for the InterCity 225, reducing the prospective numbers to be built of the latter. Without tilting carriages, it had little speed advantage over the Class 90 on the WCML.
It was decided to hold a competitive tender for the InterCity 225 programme; this measure was aimed at avoiding the difficulties experienced with the APT programme. A pre-qualification document was formalised, in which various requirements for the type were laid out; these included the need to perform mixed-traffic duties, the haulage of both tilting and conventional rolling stock, a top speed of 225km/h, a maximum cant deficiency of 9° without the provision of tilt equipment, and that the maximum unsprung mass could not exceed 1.8tonnes. Furthermore, BR stated its readiness to sub-contract with the successful bidder for the supply of technical information, advice and testing. The prequalification document was issued to BREL, Brush Traction and the General Electric Company, as well as the French firm Alsthom and Germany's Krauss Maffei. The inclusion of foreign manufacturers was in part due to the limited domestic experience with trainsets capable of such high top speeds. A total of three companies, ASEA, Brush Traction and GEC, submitted tenders for the design and construction of the Class 91 locomotive.
On 14 February 1985, the BR board approved the substitution of the Class 91 for Class 89 for the ECML programme. The tendering process was relatively complex, but a decisive move appeared to have been GEC's offer of a sub-contracting arrangement to BREL for the construction of the locomotive's mechanical elements. It would be GEC's submission that would be selected as the winner; after which a contract for the construction of 31 Class 91 locomotives, along with an option for 25 more for the WCML, was awarded during February 1986. Shortly thereafter, BREL established a production line for the type at its Crewe Works.
Post-introduction developments
The first passenger service to be operated by a Class 91 locomotive was the 17:36 King's Cross to Peterborough on 3 March 1989. From 6 March, members of the fleet began to work services between London and Grantham, and from 11 March services between London and Leeds. With the completion of the East Coast Main Line electrification programme, Class 91 trains reached Newcastle upon Tyne for the first time in service on 10 June 1991, then Edinburgh on 12 June.In service, as a part of the InterCity 225 sets, the fleet worked alongside locomotives and electric multiple units. Diesel trains displaced by the Class 91 introduction were reallocated predominantly to the Midland Main Line. The InterCity 225's introduction correlated with a significant increase in passenger numbers using the ECML within two years; one station recorded a 58 per cent increase in passengers.
In the early 1990s, after the cancellation of InterCity 250, British Rail examined the option of ordering a further set of ten Class 91s to operate on the West Coast Main Line with UK Treasury support, however the business case for these failed to prove sufficiently worthwhile. and led to the electric Networker Classes 365, 465 and 466 EMU Networker stock's procurement being taken forward.
The locomotive body is asymmetric; streamlined at the 'front' end, but left 'blunt' at the Number 2 end so as to visually blend with the fixed sets of Mark 4 coaches in normal push-pull passenger service. Because of a design requirement that the class be able to function as normal locomotives if so required, a full driver's cab is also provided at the Number 2 endbut the locomotive's maximum speed is reduced to when this cab is at the front of a train.
During the privatisation of British Rail ownership of the Class 91 fleet passed to Eversholt Rail Group, which in turn leased the fleet to its various operators. Eversholt put all 31 locomotives through a £30million heavy overhaul and refit process between 2000 and 2003, seeking to improve the fleet's reliability. Rail Magazine described it in March 2001 as being necessary because "eight out of ten failures on Class 91s were caused by the sub-standard electrics", and further noted that problems with relays in particular were the "third-biggest" cause of failures. The refit was performed by Adtranz, with technical support from Alstom, and involved upgrades to the bogies, electrical systems, air compressors, and parking brakes; alterations to the cab layout at the Number 1 end; the replacement of the original gearboxes with newly designed Voith models; and the installation of TPWS and a new air-cooling system. Overhauled units had their numbers increased by 100; thus 91001 became 91101 and so onwith the exception of 91023, which was renumbered 91132 due to sensitivity around its involvement in both the Hatfield and Selby accidents.
During the overhaul process, GNER hired in Class 90 locomotives to provide cover for their services.
In November 2012, number 91114 had a second pantograph added as a pilot project conducted jointly by Eversholt, East Coast, DB ESG, Wabtec, and Brecknell Willis. The new design uses the same mounting positions as a conventional pantograph but pairs two pantograph arms in an opposing configuration. If there is an ADD activation or the pantograph becomes detached, the train can keep going, so the system provides redundancy in the event of a pantograph/OLE failure.