Southwest Line
At the end of the 19th and the beginning of the 20th century, the Southwest Line was designed to connect the port of Le Havre to the left bank of the Seine, and then to the west and southwest of France, by crossing the river near the estuary.
For some sixty years, this railway project mobilized the energies of the region, particularly Le Havre, but it was also a bone of contention between the main cities of Upper Normandy. The systematic opposition of the inhabitants of Rouen to the construction of an engineering work downstream from their city, largely caused the failure of the line and threatened the very unity of the Seine-Inférieure department.
A long preparation period
The idea of building what would later be known as the Southwest Line undoubtedly dates back to the inauguration of the Rouen - Le Havre railroad in 1847, the second stage of the radial line connecting Paris to the sea. The route linking the two major cities of Normandy had required the construction of numerous engineering structures, five tunnels, and three viaducts, including the Barentin viaduct, which collapsed in January 1846 just a few months before being put into service. The inhabitants of Le Havre then realized that the only railroad line in their port city was insufficient and that it was full of architectural works that were rare in non-mountainous areas, but vulnerable. An additional line was therefore needed to ensure the safety of communications at the Porte Océane.However, it wasn't until the early 1870s, with the completion of dyking construction on the Seine estuary in connection with the construction of the Tancarville Canal, that the initial projects were launched. In 1870, a Parisian entrepreneur, Fresson, suggested building a railway of local interest between Le Havre and Rouen via the right bank, but much closer to the river than the railroad on the Cauchois plateau.
Although this project was soon abandoned, it was replaced in 1871 by a proposal from Delahante and Girard to build two lines, again for local interest. One would connect the two major cities of Normandy along a route almost identical to Fresson's. In contrast, the other would connect Le Havre and the département of Eure by crossing the Seine between Port-Jérôme and Quillebeuf on a ferry allowing convoys to pass from one bank to the other without breaking the load. A railroad built in the Eure between Pont-Audemer station and the banks of the Great River would have ensured the continuity of traffic to the center or Atlantic regions. This was the first mention of the Southwest Line. This project, too, was abandoned in 1873 due to the growing hostility of the Compagnie des Chemins de Fer de l'Ouest, which, while recognizing the usefulness of these sections, could not bear to see its supremacy in the region threatened.
This twist of fate put the issue on hold for some time, but two events in 1879 revived the proposals. The first was the registration of the "Pont-Audemer to Port-Jérôme Line with steam ferry on the Seine" in the classification law of July 17, known as the Freycinet law, designed to complete the railroad network. It was also Gambetta's speech on October 26 to the leading figures in Le Havre that remained famous in the memory of the supporters of the Southwest railroad:
During the next few years, new studies were carried out, with increasing emphasis on a permanent viaduct or tunnel link for crossing the Seine.
Time for great projects
The year 1883 marked a turning point in the history of the Southwest link: the inclusion of a railroad line from Pont-Audemer to Le Havre via Lillebonne and the crossing of the Great Normandy river upstream of Port-Jérôme in Table A of the Freycinet project, approved by the law of November 19, 1883, paved the way for in-depth studies. An initial proposal, drawn up by Cordier in 1886, advocated an underground crossing of the Seine through a single-track masonry tunnel. However, the difficulty of cutting through the unstable alluvial soil led to the rejection of this solution in 1888.This was only a temporary setback, however, as the last decade of the 19th century saw the emergence of several preliminary projects, spurred on by the mayor of Le Havre, Louis Brindeau:
- In 1891, the engineer Jean Berliet proposed crossing the Seine at an undetermined point near Port-Jérôme through a 4,500-metre tunnel divided into two sections: The first one, with a length of 2,000 meters and dug into stable ground, would have been bricked up, while the second one, established in alluvial deposits, would have consisted of a 2,500-meter metal tube. The latter, made for one line, would have had a diameter of 5.50 meters, leaving a circle of 5.20 meters available, and would have been formed by joining cast-iron rings 0.50 meters long, assembled from twelve identical plates.
- In 1892, it was Chemins de fer de l'Ouest's turn to propose a solution. The plan was that at Aizier, a 2,800-meter viaduct was envisaged, including 2,300 meters for the access structure over the alluvial plain on the right bank. The central steel span, with an opening of 350 meters, would have had an air draught of 45 to 50 meters, in line with the requirements of the shipping industry that frequented the port of Rouen.
- The most original and spectacular of these was the preliminary project by Danisy-Martin, submitted in 1895. The Seine would have been crossed utilizing a submerged bridge, with a concrete foundation at the bottom, resting on screw piles firmly embedded in solid ground. Rails would have been laid on top of this structure to serve as a crane track for a ferry car whose upper deck was designed to accommodate trains.
- In 1897, Arnodin, one of the great engineers of his time, proposed the construction of a railway of local interest between Le Havre and Pont-Audemer, using a transporter bridge to cross the great Normandy River. This 560-meter structure, consisting of an upper deck set at a great height and placed between two pylons, leaving a 400-meter-long sea passage between them, would have offered a fine example of metal architecture near the estuary. A cart would have rolled on the deck, to which a gondola capable of carrying a small rail convoy would have been attached employing steel cables.
Two new projects saw the light of day and prompted a public inquiry:
- The first involved the construction of a 2,300-meter viaduct with a 57-meter draught at Aizier.
- The second suggested the construction of a 6,800-meter tunnel near Tancarville.
The failure of line construction
This opposition, which resulted in furious verbal fights between representatives of the two Normandy cities in the General Council, once again delayed the announcement of the public use of the Southwest Railroad. This postponement prompted private initiatives, which were just as fruitless as the previous ones. Years passed, exasperating the people of Le Havre, but reassuring the people of Rouen.
From 1910 to 1914, the debates centered on how to cross the Seine with an overhead structure, while the Southwest Line gradually became a second railroad from Le Havre to Paris using the left bank. Discussions focused on the height of the viaduct. Engineers increased the clearance from 57 meters to 59 meters in 1911, 63 meters in 1912, and 65 meters in 1913. "Insufficient!" declared the people of Rouen, who finally won their case when the Minister of Public Works, Mr. Pichery, postponed the announcement of public use on March 18, 1914.
It was during this period preceding the First World War that the confrontation between the two great cities of Normandy came to an end. Each city, through the intermediary of one man and one or more newspapers inveighed against the merits of the project. Articles in one city's daily newspaper always countered those of the rival city. Identical arguments were used repeatedly, each time countered by similar demonstrations. The people of Rouen accused the people of Le Havre of wanting to stifle their port by limiting the ability of a certain number of ships to navigate upstream by building a viaduct, and of threatening traffic if the viaduct collapsed. The latter accused the former of acting selfishly to limit competition with the Porte Océane by reducing its outlets. At the peak of the quarrel, Le Havre town councilors, after inveighing against Rouen's leaders and showering them with insults, proposed a new division of the Normandy departments, Seine-Inférieure and Eure, based on a north–south rather than an east–west boundary, thus avoiding the enemy sisters ending up in the same administrative district.
Although the project was not officially buried when the announcement of public use was postponed, it looked very much like an abandonment. Studies resumed well after the war but were just as fruitless as before. There was renewed talk of a tunnel or a rail ferry, and of building the line as part of the war reparations owed by Germany. The enthusiasm and pugnacity of the people of Le Havre had waned over time, and even the most ardent defenders of the new railroad were growing weary. The 1920s were lost in procrastination; the economic crisis of the 1930s and the growing role of the automobile put an end to Le Havre's hopes. A final viaduct project, both technically and financially precise, was submitted in 1931, but the time was no longer ripe for major railway projects, so it was quickly abandoned.