POM-2 mine
The POM-2 is a Soviet scatterable self-liquidating fragmentation anti-personnel mine. It has a mechanical fuze with tension-type target sensors BP-09S.
The mine can be delivered using the BM-27 Uragan, BM-21 Grad MLRS, helicopter-mounted minelaying system VSM-1, remote mining machine UMZ or portable mining kit PKM.
In its armed position, it is presented as a steel cylinder with six spring-loaded fins at the bottom of the mine. It shoots out string that attach to nearby objects, which is used as a tripwire. The POM-2 mines must be delivered using remote mining systems, with the exception of POM-2R.
Function
The mine is made up of a cylindrical cast-steel cup, which contains the explosive charge. Upon detonation, the steel cylinder naturally fragments.- Upon the ejection of four mines from the KPOM-2 cassette, a pyroshock sensor activates, which ignites the pyrotechnic retarder '. At the same time, the caps of the stabilizing legs bounce out of the mine body, and the nylon ribbons unfold to ensure that the mine lands straight up.
- Upon the burn-up of the pyrotechnic retarder ', the stabilizing legs are thrown out, and another set of pyrotechnic retarders is ignited '. ' is a landing-delay mechanism, which gives the mine just enough time to land before starting any further processes.
- As pyrotechnic retarders ' burn up, they activate the expelling charges which expose the spring-loaded legs that hold the body of the mine upright.
- Due to the activation of the expelling charges that released the spring-loaded legs, another set of pyrotechnic retarders ' is activated by means of a pyroshock sensor. As finishes burning, the target sensors are ejected out of the mine, spreading the cords 10 meters apart from the mine in 4 opposite directions. Following that, a spring moves the detonator into its armed position.
Deployment
Before use, the KPOM-2 cassettes are carefully checked for cracks. If any cracks deeper than 0.3 mm are present, then the cassette must be withdrawn, as it must be hermetically sealed. Faulty cassettes are destroyed with 0.2–0.4 kg of explosives.UMZ
If the mining is performed with the usage of UMZ, then the machine must be moving at the speed in the range of 10–40 km/h. The interval between every launch is set in the control remote PUM-1V . A full load can create a minefield that is 4,100–4,200 meters long and 50–60 meters wide, with a density of 0.1-0.2 mines/meter.VSM-1
If the mining is performed with the usage of the helicopter-mounted minelaying system VSM-1, then the machine must be moving at a speed in the range of 160–220 km/h, at an altitude of 50–100 meters, with an interval between every cassette launch being 0.8 seconds. A full load can create a minefield that is 4,100–4,200 meters long and 35–65 meters wide, with an average density of 0.11 mines/meter.PKM
If the mining is performed using the portable mining kit, then it must be performed by two or more people, supported by a sapper group.9M59 Rockets
If the mining is performed using the BM-27 Uragan MLRS, then a full salvo can create a minefield consisting of 144 mines.Variants
; UI-POM-2-1 or UI-POM-2; UI-POM-2-2 or UI-POM-2A
; UI-POM-2-3 or UI-POM-2D
; POM-2R
Specifications (POM-2)
Mass- * Charge: 140 g of TNT
- * Full assembly: 1.6 kg
- * KPOM-2 cassette: 48 kgDiameter: 63 mmHeight: 180 mmTarget sensors
- * Number: 4
- * Length : 10 mActivation pressure: Fragmentation radius: 16 mTemperature range of use: -40 to +50 °СShelf life: 10 yearsSelf-liquidation time
| Temperature Range, °С | Liquidation Timeframe, hours |
| +40 to +50 | 4 to 14 |
| +20 to +40 | 6 to 16 |
| 0 to +20 | 9 to 30 |
| -20 to 0 | 13 to 39 |
| -30 to -20 | 15 to 70 |
| -40 to -30 | 25 to 114 |