Ohio Stadium


Ohio Stadium is an American football stadium in Columbus, Ohio, on the campus of Ohio State University. It primarily serves as the home venue of the Ohio State Buckeyes football team and is also the site for the university's Spring Commencement ceremonies each May. Common nicknames for the stadium include "The Horseshoe", "The Shoe", and "The House That Harley Built".
From 1996 to 1998, Ohio Stadium was the home venue for the Columbus Crew of Major League Soccer prior to the opening of Columbus Crew Stadium in 1999. The stadium also was the home venue for the OSU track and field teams from 1923 to 2001. In addition to athletics, Ohio Stadium is also a concert venue, with U2, Taylor Swift, The Rolling Stones, Genesis, Pink Floyd, and Metallica among the many acts to have played at the venue.
The stadium opened in 1922 as a replacement for Ohio Field and had a seating capacity of 66,210. In 1923, a cinder running track was added that was later upgraded to an all-weather track. Seating capacity gradually increased over the years and reached a total of 91,470 possible spectators in 1991. Beginning in 2000, the stadium was renovated and expanded in several phases, removing the track and adding additional seating, which raised the capacity to 101,568 by 2001 and to 102,329 in 2007. In 2014, additional seating was added in the end zone, raising the official capacity to 104,944. Another renovation to add more luxury suites began in 2017 and will eventually lead to a decrease of 2,600 seats. It is the largest stadium by capacity in the state of Ohio, and the third largest on-campus football stadium in the United States. Ohio Stadium was added to the National Register of Historic Places in 1974.

Construction

As early as 1913, Ohio Field at High Street and Woodruff Avenue was unable to contain the crowds attracted to many Buckeye home football games. This led to faculty discussion of moving the site elsewhere and building a new facility. The growing popularity of football in Ohio led to the design of a horseshoe-shaped stadium, conceptualized and designed by architect Howard Dwight Smith in 1918. A public-subscription Stadium Campaign to fund the project began in October 1920 and raised over $1.1 million in pledges by January 1921, of which $975,001 were actually honored.
The stadium was built in 1922 by E. H. Latham Company of Columbus, with materials and labor from the Marble Cliff Quarry Co. at a construction cost of $1.34 million and a total cost of $1.49 million. The stadium's original capacity was 66,210. Upon completion, it was the largest poured concrete structure in the world. Many university officials feared that the stadium would never be filled to capacity.
Smith employed numerous revolutionary architectural techniques while building the stadium. At the base is a slurry wall to keep out the waters from the Olentangy River; the stadium rests on the flood plain. Instead of building a large bowl like the previously constructed Yale Bowl, Ohio Stadium was designed to have an upper deck that would hang over part of the lower deck, giving Ohio Stadium its "A", "B", and "C" decks. Instead of employing numerous columns like those at Harvard Stadium, Smith designed double columns that allow for more space between columns. The rotunda at the north end of the stadium, which is now adorned with stained glass murals of the offensive and defensive squads that comprise the Buckeye football team, was designed to look like the dome at the Pantheon in Rome.

History

The first game in the stadium was against Ohio Wesleyan University on October 7, 1922, and brought a crowd of around 25,000, which left people concerned because the stadium was half empty. This concern was put to rest at the stadium's formal dedication against Michigan on October 21, which the Wolverines won, 19-0. The crowd was announced at the game to be 72,000, but no one is really sure how many people made it into the stadium. This attendance mark was broken in a game against Michigan in 1926 when 90,411 came out to support the Buckeyes; this is also the last time standing-room-only tickets were sold for a game.
The stadium did not regularly sell out until after World War II, and in the 1920s and 1930s most games only drew in 20,000 or 30,000 fans with many more attending the annual game against Michigan. The 1935 contest with Notre Dame was a sellout, with over 81,000 in attendance.
In 1923, a cinder track was built around the football field, which would later be named after Olympian and Ohio State athlete Jesse Owens. The stadium was home to the OSU track and field teams until the opening of Jesse Owens Memorial Stadium in 2001.

Renovations

As time passed, minor adjustments raised the seating capacity to more than 90,000. In 1984, a new $2.1 million scoreboard was installed. The stadium was heavily renovated from 1998 to 2001. The press box was replaced, additional seating was installed, and 81 luxury suites and 2,500 club seats were added. The south end zone scoreboard was also replaced by a video board that is able to show replays, highlights, animations, graphics and statistical information. Additionally, a smaller version of the south end scoreboard was added to the north end and a new LED ribbon board that runs end-zone to end-zone was added to the balcony prior to the 2009 season. In 1998, the track was removed and a slurry wall was built underneath the field to allow it to be lowered, which places it below the water table. After the 1999 season, the field of play was lowered to add seating closer to the field. The temporary bleachers in the south end zone were replaced with permanent seating. However, the south end of the stadium remains partially open, thus allowing the stadium to maintain its notable horseshoe configuration. General improvements were made in the seating and concourse areas. The result of the $194 million renovation was a capacity that rose to 101,568. 80% of the cost of the renovation was funded by the sale of leases on the suites and club seats, with the remaining 20% funded by donations and the sale of naming rights for portions of the stadium. No public or university money was spent in the renovation process.
In 1971, the natural grass field was removed, and AstroTurf was installed, compliments of a donation by Lou Fisher in dedication to fellow football player Joseph Campanella. A plaque was placed on the southeast corner in memory of Campanella. In 1979, the surface was replaced with SuperTurf. In 1990, natural grass made its return to the Horseshoe, in the form of a special grass called "Prescription Athletic Turf." New field designs were put in place for the 1992 season and existed through the 2006 season. During the 2006 season, problems with the natural grass began to arise. After serious damage to the field during use in the spring of 2006, the field never recovered and had to be re-sodded. That grass never took root because of bad weather, and the university was forced to re-sod the field again only three weeks after the old sod was laid. The university spent approximately $150,000 to perform both soddings. In response to this, OSU replaced the natural grass with FieldTurf for the 2007 season. This new artificial turf looks and feels like real grass but requires minimal upkeep.
file:Columbus, Ohio - Highsmith 21.jpg|thumb|300px|Stadium exterior in August 2020
In March 2012 the university announced a $7 million renovation to the scoreboard installed during the 2000–01 renovation. The project began April 23 and was completed in time for the 2012 season opener on September 1. The current scoreboard includes a Panasonic HD screen, stretching, and incorporates upgrades to the audio system and the LED running boards. A Pro Sound audio system with 25 different speakers flank the scoreboard. Older speakers throughout the Horseshoe received improvements and will eventually be replaced by new speakers fitted into the existing framework.
Prior to the 2014 season, 2,500 seats were added to the south stands. These seats were built over the entrance tunnels and raised the official capacity of the stadium to 104,851, making it the third largest stadium in the country and the fourth largest stadium in the world. The renovations also included permanent lights added to the northeast and southeast corners of the stadium, as well as atop the press box, and the playing surface was replaced.

Field name

The playing surface at Ohio Stadium is known as Safelite Field, named for Columbus-based Safelite, a glass repair company. The naming rights deal was announced August 26, 2022, and allows the company’s logos to be displayed on the field. The name of the facility, however, did not change.

Timeline of seating capacity

CapacityYears
66,2101922–1943
72,7541944–1947
78,6771948–1957
79,6581958–1960
79,7271961
81,1091962–1968
81,4551969–1970
81,4751971
81,6671972
82,5671973
83,0801974
83,1121975–1981
85,2901982–1984
85,3991985–1988
86,0711989–1990
91,4701991–1994
89,8411995–1999
95,3462000
101,5682001–2006
102,3292007–2014
104,9442014–2017
102,0822018
102,7802019–present

Night football games

Before the 2014 renovations, Ohio Stadium did not have permanent lights at the stadium, thus night games were rare. Ohio State's first night game in the stadium was played on September 14, 1985, when the #9 Buckeyes defeated the Pittsburgh Panthers, 10–7. Ohio State did not play another night game at Ohio Stadium until September 11, 1993, when the 16th-ranked Buckeyes defeated #12 Washington 21–12. Ohio State played a total of 12 more night games before permanent lighting was installed, nine of which were against ranked opponents.
Below is a table of teams the Buckeyes have faced in multiple night games at Ohio Stadium.
MatchupsOpponentOSU Record
3Penn State2–1
2Nebraska2–0
2Washington2–0
2Wisconsin2–0