Hudson Line (Metro-North)


The Hudson Line is a commuter rail line owned and operated by the Metro-North Railroad in the U.S. state of New York. It runs north from New York City along the east shore of the Hudson River, terminating at Poughkeepsie. The line was originally the Hudson River Railroad, and eventually became the Hudson Division of the New York Central Railroad. It runs along what was the far southern leg of the Central's famed "Water Level Route" to Chicago.
Croton–Harmon station divides the line into two distinct segments. South of there, the line is electrified with third rail, serving suburban stations located relatively close together. Most of the electrified zone has four tracks, usually two express and local tracks in each direction. For a few miles in the Bronx between Spuyten Duyvil and Yankees–E 153rd St, there are only two or three tracks. Local service is usually provided by electric trains, while diesel trains run express. North of Croton–Harmon, the line is not electrified and is mostly double-tracked, with the stations spaced further apart. Service between Croton–Harmon and Poughkeepsie is provided by diesel trains; these generally run express and skip most of the stations below Croton-Harmon. From just north of Spuyten Duyvil to the end of the line, the Hudson Line forms the southern portion of Amtrak's Empire Corridor, the former main line of the Central. The planned Penn Station Access project would send some Hudson Line trains to Penn Station along the Empire Connection, with two new intermediate stops along the west side of Manhattan.
The Hudson Line is colored green on Metro-North timetables and system maps, and stations on the line have green trim. The New York Central used green color-coding for the Hudson Division as early as 1965.

History

New York Central

The Hudson River Railroad was chartered on May 12, 1846 to extend the Troy and Greenbush Railroad, which connected Troy and Albany, south to New York City along the east bank of the Hudson River. Service began on the first of the line from Chambers Street and Hudson Street in Lower Manhattan to Peekskill on September 29, 1849. Service was extended to New Hamburg on December 6 and to Poughkeepsie on December 31. A separate section opened between East Albany and Hudson on June 16, 1851. This section was extended to Oakhill on July 7 and to Tivoli on August 4. The full line opened on October 8, 1851 with the completion of the final segment between Tivoli and Poughkeepsie, linking the two pieces of the line together. Prior to completion, on June 1, the Hudson River leased the Troy and Greenbush.
Cornelius Vanderbilt purchased the Hudson River Railroad in 1864, soon after he bought the parallel New York and Harlem Railroad, which is today's Harlem Line. He merged these and other short line railroads to form the New York Central and Hudson River Railroad, which was renamed the New York Central Railroad in 1914.
One of the properties owned by the New York and Harlem was the Spuyten Duyvil and Port Morris Railroad. This railroad was built in 1842, and bought in 1853 by the New York and Harlem as part of a proposal by NY&H Vice President Gouverneur Morris Jr. to integrate it into a new industrial section of the waterfront. After this railroad became property of the New York Central and Hudson River Railroad, by 1871, the line was extended through the West Bronx, along the Harlem River to connect with the Hudson River Railroad. The segment north of Mott Haven Junction became part of the Hudson Division, while the portion to the south remained part of the Harlem Division. With the opening of the line, most passenger trains were rerouted into the new Grand Central Depot via that line along the northeast bank of the Harlem River and the New York and Harlem Rail Road, also part of the New York Central system.
In 1893, a third track was added along the line between Spuyten Duyvil and Sing Sing.

Realignment and electrification

This line was rebuilt and realigned in 1905–1906 when the Harlem River Ship Canal was built. The line was realigned along the north side of the canal in Marble Hill, Manhattan. Part of the original segment around Marble Hill became a freight spur leading to the Kingsbridge Freight Station, but the track around the northern and western sides of Marble Hill was later removed and no trace of it exists. Today, the realigned line serves as the segment of the Metro-North Railroad Hudson Line between Mott Haven Junction and the West Side Line. The former Kingsbridge Freight Spur and station has been occupied by the grounds of the John F. Kennedy High School since the 1970s. The New York and Putnam Railroad spur remained until 1999.
As part of the construction of Grand Central Terminal in the early 1900s, all of New York Central's lines that ran into the terminal were electrified. Third rail was installed on the Hudson and Harlem Divisions, while the New Haven Division received overhead wires on the segments that were not shared with the Harlem and Hudson Division. The first electric train departed for the temporary Grand Central Station, from the Harlem Division's High Bridge station in the Bronx, on September 30, 1906. Electrification would eventually extend to Croton–Harmon station.
The former main line south of Spuyten Duyvil remained for freight to the docks along Manhattan's west side and minimal passenger service to the West Side Station on Chambers Street. Passenger service on this line, which became known as the 30th Street Branch, continued until late 1929 or early 1930.
The New York Central operated many intercity and commuter trains over this line for many years. It was a key route in connecting Grand Central Terminal in New York to LaSalle Street Station in Chicago. Commuter service was always concentrated south of Poughkeepsie: by 1940, only three daily round trips – none of them timed for commuting to New York City – made local stops between Albany and Poughkeepsie. By 1960, only a single daily round trip made local stops. It was cut to a Hudson–Albany round trip with four intermediate stops by 1964, and discontinued around 1965; some intercity trains continued to stop at Rhinecliff and Hudson.

Penn Central and Conrail

At the end of World War II, private rail service began a sharp decline with the start of the Jet Age and the construction of the Interstate Highway System. NYC, facing declining year-over-year profits, merged in 1968 with its former rival, the Pennsylvania Railroad, forming the Penn Central Transportation Company. Penn Central continued to lose money and attempted several maneuvers to delay bankruptcy, including auctioning off the air rights of Grand Central Terminal; the Pennsylvania Railroad had done the same thing to Penn Station. However, this approval was denied, and the denial was affirmed in Penn Central Transportation Co. v. New York City, a 1978 decision by the United States Supreme Court.
File:PCRR HUD 19731028.png|190px|thumb|Penn Central Railroad Form 105 effective October 28, 1973 showing Hudson Line suburban timetables of the newly created Metropolitan Region. The then-new Budd M-1 Metropolitan rail cars had just been delivered and placed into service.
On May 1, 1971, the National Railroad Passenger Corporation took over all intercity passenger service in the US. Penn Central continued to operate freight and commuter service along the Hudson line until it was folded into Conrail on April 1, 1976. Conrail continued to operate commuter service to Poughkeepsie & freight service north of Poughkeepsie. On July 1, 1973, along with several other stations in Penn Central's Metropolitan Region, the 138th Street, Oscawana and Manitou stops were closed. Manitou reopened in 1983.
On September 10, 1974, the MTA announced that work would start on the construction of high-level platforms at eleven stations in the Bronx and Manhattan including at the Marble Hill, Spuyten Duyvil, University Heights, Morris Heights and Riverdale stations on the Hudson Line. The entire project cost $2.8 million. The work was expected to be completed in the late summer of 1975. As part of the work, the University Heights, Morris Heights and Marble Hill stations had island platforms installed, while side platforms were installed at Riverdale and Spuyten Duyvil. All of the platforms on the Hudson Line were -long with the exception of a -long side platform at Spuyten Duyvil and a -long platform at Morris Heights, which was set to be lengthened at a later date. The abandoned station building at University Heights was removed as part of the project. High-level platforms at Spuyten Duyvil and Riverdale were completed in early 1975. On May 2, 1975, the new platforms on the Hudson Line were formally put into service. The completion was marked with a ceremony with the head of the MTA, David Yunich present. The completion of these five stations marked the completion of a $22.8 million project to install high-level platforms at 43 Penn Central stations. The high-level platforms allowed the new Metropolitan and Cosmopolitan to use the stations.
During the late 1970s, the Hudson Line's former northbound express track between Spuyten Duyvil and its merger with the Harlem Line was removed. The stations along the line between Spuyten Duyvil and Yankees–East 153rd Street were rebuilt on top of this track's roadbed.

Metro-North

In 1983, the MTA Metro-North Railroad took control of all commuter operations in the Hudson Valley. As part of the MTA's five-year capital program in 1982, the MTA planned to remove one of the four tracks on the line. The MTA expected that the change would provide more flexible train service as the line would have received a computerized system capable of running trains in either direction on the three tracks. As part of the plan, trains would have received cab signalling. The change was expected to be completed in three to four years. The New York State DOT and Amtrak were strongly opposed to the proposal as the plan did not take into account future growth of passenger and freight traffic, and reduced the ability to move around stalled trains. Converting the then-existing four tracks to reversible cab signaling would have cost $15 million, which the MTA did not have.
On May 23, 2009, a new station was opened at East 153rd Street in the Bronx to serve Yankee Stadium. It sees regular service on the Hudson Line, plus special service from the Hudson, Harlem, and New Haven Lines for New York Yankees games.
On December 1, 2013, a southbound train derailed near the Spuyten Duyvil station in the Bronx. Four people were killed and more than 60 passengers were injured in the crash. Federal investigators from the National Transportation Safety Board determined that the train was traveling at, a speed nearly three times the maximum allowable speed of. The train's brakes were apparently operating normally and area tracks in proper condition.