O'Shaughnessy Dam (California)


O'Shaughnessy Dam is a concrete arch-gravity dam in Tuolumne County, California, United States. It impounds the Tuolumne River, forming the Hetch Hetchy Reservoir at the lower end of Hetch Hetchy Valley in Yosemite National Park, about east of San Francisco. The dam and reservoir are the source for the Hetch Hetchy Aqueduct, which provides water for over two million people in San Francisco and other municipalities of the west Bay Area. The dam is named for engineer Michael O'Shaughnessy, who oversaw its construction.
File:Hetch Hetchy Drainage Basin.jpg|thumb|Hetch Hetchy Reservoir watershed
Although San Francisco had sought Tuolumne River water as early as the 1890s, this project did not move forward until the disastrous earthquake and fire of 1906, which underscored the insufficiency of the existing water supply. The Hetch Hetchy Valley – then compared to Yosemite Valley for its scenic beauty – was chosen for its water quality and hydroelectric potential, but the location within the national park generated controversy. An act of Congress was required to circumvent federal protection of the Tuolumne River, with the reasoning that public land should be developed for the public benefit.
Construction of the dam started in 1919 and was finished in 1923, with the first water delivered in 1934 after numerous delays. From 1935 to 1938, the dam was raised to increase its capacity for water supply and power generation. The dam, aqueduct and appurtenant hydroelectric systems are collectively known as the Hetch Hetchy Project. Deriving from a largely wild and pristine area of the Sierra Nevada, the Hetch Hetchy supply is some of the cleanest municipal water in the US, requiring only primary filtration and disinfection.
Hetch Hetchy represented the first great environmental controversy in the US, and debate over the dam and reservoir continues today. Preservationist groups such as the Sierra Club lobby for the restoration of the valley, while others argue that leaving the dam in place would be the better economic and environmental decision.

Background

In the late 19th century, the city of San Francisco was rapidly outgrowing its limited water supply, which depended on intermittent local springs and streams. The city looked east to the Sierra Nevada, where snowmelt fed the headwaters for many of California's largest rivers. In 1890, San Francisco mayor James D. Phelan proposed to build a dam and aqueduct on the Tuolumne River, one of the largest southern Sierra rivers, as a way to increase and stabilize the city's water supply. In 1900, a United States Geological Survey report also described the Tuolumne River as "the best source of sustainable water for San Francisco". Although Phelan managed to secure water rights for the Tuolumne River in 1901, his appeals to the federal government for development of the Hetch Hetchy Valley were unsuccessful. But when the 1906 San Francisco earthquake and subsequent fire razed the city, the dangerous inadequacies of the city's water supply system were brought to national light.
Image:Hetch-Hetchy-dam-site.jpg|thumb|left|The site of O'Shaughnessy Dam before construction began, c. 1914
Out of fourteen potential water sources considered by the city – which included Lake Tahoe, the Eel River, and tributaries of the Sacramento and San Joaquin Rivers – Hetch Hetchy was considered superior for its excellent dam site, abundant sediment-free water, lower cost and hydroelectric potential. At the time, Hetch Hetchy was an isolated, seldom visited subalpine valley, visited intermittently by gold seekers and sheepherders. However, since 1890, Hetch Hetchy Valley and the surrounding lands had been part of Yosemite National Park and thus off-limits to utility development, let alone at the grand scale proposed by the city. Even though the valley was not well known to the general public, organizations such as the Sierra Club treasured it for its spectacular beauty, often compared to that of Yosemite Valley itself. Led by naturalist and mountaineer John Muir, the Sierra Club adamantly opposed the city of San Francisco as it sought permission from the federal government to build a dam in the valley.
In 1908 Secretary of the Interior James R. Garfield responded to San Francisco's appeal, granting the city rights to development at Hetch Hetchy, stating that "Hetch Hetchy was not unique, a lake would be even more beautiful than its meadow floor and the hydroelectric power generated could eventually pay for the costs of construction." One of the strongest supporters of the Hetch Hetchy project was Gifford Pinchot, Chief Forester of the United States Forest Service, who pushed a policy of "conservation through use", promoting the sustainable development of natural resources in the U.S. On December 19, 1913, President Woodrow Wilson signed the Raker Act, which permitted San Francisco's development of the Hetch Hetchy project on the terms that water and power derived from the project could only be used for public utilities, not private profit. Though highly controversial, the bill passed the Senate by a vote of 43 for and 25 against. The consensus was that since Hetch Hetchy lay on public land, it was reasonable for its natural resources to be developed for the public benefit.
Muir, the Sierra Club and other groups were outraged by the federal government's permission for development at Hetch Hetchy. However, on December 24, 1914, with construction on the dam barely underway, Muir died, leaving his Sierra Club to fight a protracted battle against the Hetch Hetchy Project over the next ten years. "Dam Hetch Hetchy!" Muir had said – "As well dam for water tanks the peoples' cathedrals and churches, for no holier temple has been consecrated by the heart of man!" The Sierra Club argued that it was not necessary for San Francisco to destroy the valley for its water supply, pointing out the availability of other sites with reasonable proximity – including the Mokelumne River, which the U.S. Army Corps of Engineers reported in 1913 as "a better and cheaper source than Hetch Hetchy". By this point, however, San Francisco had become "obsessed" with developing Hetch Hetchy, and "dismissed or discarded other rivers and valleys that would have served them better ... as if it was created for their purpose."

Construction

Work on the Hetch Hetchy project began in early 1914 shortly after the passage of the Raker Act. The city hired John R. Freeman, who had previously worked on the water supply systems of Boston and New York City, to plan the complex dam and aqueduct system. Civil engineer Michael O'Shaughnessy would oversee the construction and design details of the Hetch Hetchy project. The dam in Hetch Hetchy Valley would subsequently be named in his honor. Before construction of O'Shaughnessy Dam could commence, the city completed a high dam at Lake Eleanor to provide water for the Early Intake Powerhouse, which was necessary to provide electricity for the construction site of the larger dam.
Initial construction of the dam cost $6,121,000, and was largely financed by revenue bonds issued by the city of San Francisco. To transport workers and materials, the city hired Frederick Rolandi, a San Francisco engineer who had previous experience designing railways, to oversee construction the Hetch Hetchy Railroad. The railway would be a standard gauge line that followed the narrow canyon of the Tuolumne River to the remote dam site. Built from 1915 to 1918 by a workforce of roughly 900, the railway allowed for supplies to be shipped directly from San Francisco along the Southern Pacific and Sierra lines which connected to the Hetch Hetchy line. The railroad principally used geared Shay locomotives to negotiate its dangerous winding curves and steep 4 percent grades.
Actual groundbreaking on O'Shaughnessy Dam was on August 1, 1919, when Utah Construction Company of San Francisco began preparing the dam site for construction. Workers began clearing the trees in Hetch Hetchy Valley to prepare it for receiving waters of the future reservoir. A diameter tunnel, later expanded to, was dug around the south side of the O'Shaughnessy Dam site, and a timber crib cofferdam diverted the waters of the Tuolumne River into the tunnel during construction. The riverbed on the site of the future dam was excavated over before hitting the granite bedrock. A retaining wall was poured on the upstream side to prevent water seepage into the foundation hole, and the granite was scoured and artificially roughened to prepare for receiving concrete.
Image:Oshaughnessy dam s.jpg|thumb|left|The dam as initially completed in May 1923
The concrete for the dam was processed in a plant located shortly upstream from the construction site, with sand and rock excavated from abundant alluvial deposits in the Hetch Hetchy valley. This was mixed with cement shipped in on the Hetch Hetchy Railroad and local boulders ranging from to several yards in diameter to produce a cyclopean construction material for the dam. Beginning in September 1921, the concrete was hoisted up a tower on the south side of the gorge, from which it could flow down movable chutes by gravity to the construction site. A total of of concrete was poured to form a dam standing above the riverbed and above foundations. The last concrete was placed in February 1922 and the dam was completed in May 1923. At the time, it was the second tallest dam in the United States, after Idaho's Arrowrock Dam. On May 24, 1923, the reservoir filled for the first time. A peak labor force of five hundred worked on the project, which claimed the lives of 67 men and one woman.
The first hydropower was delivered in 1925 with the completion of the Moccasin Powerhouse, fed by Hetch Hetchy water through the Canyon and Mountain Tunnels. However, the first water deliveries did not reach San Francisco until 1934, eleven years after the completion of O'Shaughnessy Dam and twenty years after groundbreaking of the Hetch Hetchy project. O'Shaughnessy Dam had been designed with adequate foundations and a unique stepped face in order to make possible a future increase in the dam height. This was done in anticipation of rapid growth in the demand for water and hydroelectricity. Indeed, between 1935 and 1938, the dam was raised by ; a new spillway and outlet channels were constructed to accommodate the increased height and storage capacity, which helped to increase summer generation at downstream powerhouses.