British Rail Class 144
The British Rail Class 144 Pacer is a retired class of diesel multiple unit passenger trains built at Derby between 1986 and 1987. British Rail, seeking to procure improved derivatives of the earlier Class 141, placed an order with the manufacturers British Rail Engineering Limited and Walter Alexander to construct their own variant, the Class 144. A total of 23 units were constructed. All units were retired from main line service by 2020, though the majority of the units have been acquired for preservation on heritage railways and for other uses. As of December 2022, 19 out of the 23 units have been purchased following withdrawal, of which 14 units are in operational condition.
Background
By the beginning of the 1980s, British Rail operated a large fleet of first generation DMUs, which had been constructed in prior decades to various designs. While formulating its long-term strategy for this sector of its operations, BR planners recognised that there would be considerable costs incurred by undertaking refurbishment programmes necessary for the continued use of these aging multiple units, particularly due to the necessity of handling and removing hazardous materials such as asbestos. In light of the high costs involved in retention, planners examined the prospects for the development and introduction of a new generation of DMUs to succeed the first generation.In the concept stage, two separate approaches were devised, one involving a so-called railbus that prioritised the minimisation of both initial and ongoing costs, while the second was a more substantial DMU that could deliver superior performance than the existing fleet, particularly when it came to long-distance services. While the more ambitious latter requirement would ultimately lead to the development of the and the wider Sprinter group of DMUs, BR officials recognised that a cheaper unit was desirable for service on the smaller branch lines that would not be unduly impacted by lower performance specs or a high density configuration. As such, work to progress both approaches was undertaken by BR's research department during the early 1980s.
During this period, a number of prototypes were constructed to explore different designs and approaches for implementing the railbus concept. One such vehicle was a single two-car unit, designated as the, that was constructed between 1979 and 1981. This prototype was introduced with much fanfare during June 1981. Initial testing with the Class 140 uncovered several issues, such as difficulty detecting the type via track circuits; this was reliably resolved by swapping the material of the brake blocks from a composite to iron. Two less easily addressable drawbacks were the high level of noise generated during transit, particularly on older jointed rails, which was a consequence of the railbus's direct connection between the underframe and suspension with the body that transmitted impact forces across the body. It was also observed that the inclusion of strengthening members in the mass-produced bus body added significantly to the overall production cost, which eliminated much of the cost advantage that was the primarily goal of the type.
The Class 140 was viewed to be an overall success, and thus BR issued an order for an initial production model, designated Class 141, to British Leyland during 1984 with production commencing thereafter. During its early years of service, the Class 141 experienced numerous issues, particularly with the transmission and ride quality; work undertaken at BR's direct resulted in the quick development of numerous improvements to at least partially address these shortcomings. When it came to ordering more railbuses, however, it was decided that instead of placing these follow-on orders for further Class 141, it would be more desirable to procure improved derivatives of the Class 141. Accordingly, BR placed orders for two new models of the Pacer family with separate manufacturers, these being the and respectively. Thereafter, another and final Pacer model would be ordered, this being the Class 144.
Description
A total of 23 Class 144 units were constructed. The units have a maximum speed of and are externally similar to the earlier Class 143 Pacers, sharing a near-identical body built by Walter Alexander. The first thirteen of the classnumbers 144001 to 144013are two-car units, while the remaining ten144014 to 144023have a third vehicle that was added later. These ten Pacers are the only ones to use intermediate vehicles.Units are formed of two driving motors, one of which contains a toilet. The three-car units have an additional intermediate motor. All vehicles have standard-class seating only. The technical description of the formation is DMS-DMSL. Individual vehicles are numbered as follows:
- DMS: 55801–55823
- MS: 55850–55859
- DMSL: 55824–55846.
The Class 144 units are equipped with BSI couplers. This allows them to work in multiple with Classes,,,,,,,, and units, as well as units of the same class.
Operations
British Rail
The first Class 144 units were delivered during 1986. They were produced specifically to perform local services sponsored by the West Yorkshire Passenger Transport Executive. As such, the fleet was painted in the crimson/cream West Yorkshire Metro livery, although three units were later repainted into Regional Railways livery. During the British Rail era, the type was normally used on services such as the Harrogate Line between York, Harrogate, and Leeds, the Huddersfield Line's Wakefield section between Leeds and Huddersfield, along with the Huddersfield branch of the Calder Vale line. Class 144s were also operated on the Hallam Line between Leeds, Barnsley, and Sheffield; the Penistone Line between Huddersfield, Barnsley, and Sheffield; and the Pontefract Line between Wakefield and Pontefract.The Class 144 was also tasked with additional routes, including the Leeds-Morecambe services, services between Scunthorpe and Adwick to Sheffield and Lincoln. More recently from 2008, they have been working between Manchester Victoria and Leeds amongst others. Prior to 1994, they were also used on Leeds/Bradford-Ilkley and Leeds/Bradford-Skipton services. These lines were electrified in 1994, and passenger services were operated by electric multiple units.
Early operations of the type were marred by unreliability to the extent where the Class 144 was commonly substituted for at the last minute by either first generation DMUs or locomotive-hauled trains. Their poor serviceability was common to all production Pacer types. According to industry periodical Rail magazine, the Class 144's mechanical transmission was frequently attributed as being the largely single cause of these issues, while undesirable instances of wheel slippage was another common occurrence. As a consequence, the propulsion systems of not only the Class 144 but its Classes 142 and 143 siblings were replaced after only a few years of service. This refit not only resolved much of the unreliability issues but also gave the Pacer greater acceleration through the installation of a more powerful engine.
Privatisation era
Since the privatisation of British Rail, the Class 144 has been operated by several franchises. The first private operator was Northern Spirit, which was later taken over by Arriva Trains Northern; the latter opted to refurbish its fleet between 2002 and 2004 to enable its continued service. Post-refurbishment, the units emerging in a new silver and red Metro livery complete with refurbished interior. In December 2004, the fleet was transferred to the then-new Northern rail franchise. Northern Rail replaced the silver and red Metro livery with Northern Purple and Blue. By April 2010, all Class 144s had been repainted into this new livery.Around 2010, Northern Rail subjected their fleet of Class 144s to another refurbishment programme. The first unit to be refurbished was 144006; it had also the first one to be refurbished in the joint Arriva Trains Northern/WYPTE Metro programme in 2002. The refurbishment enhancements involved numerous interior changes, including the installation of 'easy to mop' flooring, an extended area for bike storage at one end of the car by removing a bulkhead wall and extending the perch seats from three to four, repainted hand grips and stanchions, new dado side panels and repainted wall ends, retrimmed seats in the purple Northern Rail moquette, a repainted ceiling, and repainted driving cab.
During April 2016, Northern Rail's Class 144s were all transferred to the new franchisee Arriva Rail North; in turn, Northern Trains took over operations of the fleet on 1 March 2020.
Rail Vehicle Accessibility Regulations 2008 and the subsequent Persons of Reduced Mobility - Technical Specification for Interoperability require that all public passenger trains must be accessible by 1 January 2020. As originally delivered, the Class 144 does not meets this requirement and has to be withdrawn without modifications to become compliant. During the 2010s, the rolling stock leasing company Porterbrook proposed an extensive refurbishment of the Class 143 and Class 144 fleets with the purpose of satisfying the diverse needs of this requirement; it was noted that the envisioned modifications would necessitate a significant reduction in the number of seats available. All were to be withdrawn by December 2019. Northern ordered the and units to replace the Pacers, as well as taking on spare stock from other operators. However, due to the late delivery of the new trains, the 144s were to remain in service in the South Yorkshire area until the middle of 2020. Northern accordingly sought and received a dispensation allowing continued use until 31 August 2020, on certain specified routes only.