Harlington railway station
Harlington railway station is located in Bedfordshire. It is named after the village of Harlington, on the outskirts of which it is located, but serves a wide rural area including the larger villages of Toddington and Barton-le-Clay.
History
It was built by the Midland Railway in 1868 on its extension to St. Pancras. The original intention had been to call it "Harlington for Toddington". The station buildings still exist and were carefully restored in the early 1980s. The station is situated on the Midland Main Line and managed by Thameslink.Stationmasters
In 1909, the station master, William Drake, was killed at the station whilst directing shunting operations at the station. A verdict of accidental death was recorded.- T. Tomblin, 1870–1875
- Frederick Christian, 1875–1898
- G.G. Best, 1898–1903
- William Drake, 1903–1909
- Ernest Joseph Clulow, 1909–
- J.J. Davies, –1924
- Robert Arthur Gill, 1924–1931
- Frederick Charles Watson, 1933–1940
- A. Latimer, 1940–?
Services
The typical off-peak service in trains per hour is:
- 4 tph to
- 2 tph to
- 2 tph to Three Bridges via
The station is also served by a half-hourly night service between Bedford and on Sunday to Friday nights.
Facilities
Harlington station has the following facilities:- Shelters on each platform
- 1 telephone
- 1 Ticket Machine
- Cycle storage for 44 bikes
- Car park with 127 spaces
As well as Harlington village itself, the station also serves the villages of Barton-le-Clay, Toddington and Westoning.
Ticket Office opening hours
The ticket office is open for just over 7½ hours per day Mondays to Friday and 6 hours per day on Saturday.In January 2009, the previous franchisee First Capital Connect proposed that the ticket office at Harlington railway station would open for just four hours per day. The proposals were for the office to open at 0645 and close at 1030 on weekdays. There would be no weekend opening under these proposals. The single automated ticket machine, which was stolen in summer 2008, was replaced the same week that the proposals were announced. Subsequently, whilst a reduction in hours was agreed, although not to the degree set out in the initial proposal.